;
top of page
Search

Product launch roadshow: how to plan technical production across several cities

Writer: Mobile Event
Mobile Event
Oct 28
2 min read
In short: A national launch tour takes the same show to several cities and different venues. Technical production starts from the smallest venue, uses a modular setup that repeats the same way everywhere and a crew that travels with the tour. Planning starts 16-24 weeks ahead.

Updated: October 2026.


What changes compared with a single-city launch

For a one-off launch, the configuration is built for one room. On a tour, the same show has to look the same in rooms with different ceilings, power and access. That changes 4 things:


  • The setup is modular. Screen, sound and lighting are built from modules that are added or removed per venue, keeping the same image proportions.

  • Content has versions. Video and graphics are prepared for every screen format on the tour.

  • Transport has a plan. Route, unloading and setup times are set for each city.

  • The crew stays the same. The same technicians and project manager travel from city to city, so the show repeats without being relearned.


How each city is prepared

  1. Venue survey. Ceiling height, rigging points, available power and truck access.

  2. Venue technical plan. The same show, adapted: where the screen goes, how many modules fit, where the control desk sits.

  3. Permits. For outdoor events or temporary structures, the ISU check (Romanian emergency services inspectorate) happens in every city.

  4. Setup and rehearsal. Setup, full system test and a rehearsal with the presenters before every event.

  5. Teardown and travel. A full inventory before leaving, then transport to the next city.


A tour timeline

For multi-city tours, contact the technical producer 16-24 weeks ahead. Venue surveys happen in the first weeks, because a venue smaller than expected changes the configuration for the whole tour.


Common mistakes

  • A setup designed for the largest room that doesn't fit the smallest one.

  • Too little time between cities for transport, setup and rehearsal.

  • Content made for a single screen format.

  • Backup equipment only at the first event of the tour.


Frequently asked questions

How far ahead should you plan a product launch tour?

16-24 weeks ahead, to leave time for venue surveys in every city and a shared setup.

Can you use the same technical setup in every city?

Yes, if it's modular and starts from the smallest venue. Larger rooms get extra modules.

What do you check at each venue on the tour?

Ceiling and rigging points, available power, truck access and, for outdoor events, the ISU check.



 
 
bottom of page